
Add to Cart
Cold Runner Overmolding Injection Molding / Plastic Mould Tools Music Toys
Mould Specification
1 | Mold Base | LKM,DME,HASCO,Customization Etc. |
2 | Cavity Material | S136,718H,1.2738,1.2343,1.2344,1.2312,H13,SKD61,DAC,DAC-MAGIC,D2,W304,W403,8407,2085,NAK80, 45#, 50#, Aluminum for prototype mold,Etc |
3 | Materical Surface Treatment | Nitride,Pre-Harden,Heat Treatment,Quenching |
4 | Cavity Qty | Single-cavity & Multi-cavity |
5 | Material Treatment | Nitride,Heat Treatment,Quenching,etc |
6 | Feeding System | Cold runner,Hot runner,hot runner brang include: Inco, Synventive,Mast,Yodu and some domestic brand |
7 | Mold Surface Treatment | Texture,Electroplate,etc |
8 | Plastic material for parts | BMC,PMMA,PC/ABS,PS, SAN, PA, POM, ABS, PP, PET, PC, PE, PPS,HDPE, PA66+GF, PVC, TPE, TPU, TPV etc |
9 | Mould Life | 50K-2000K shots |
10 | Design Software | Mainly use UG and CAD, also ok for Pro/E and Solid Works |
11 | Quality | ISO9001:2000 , ISO14001-2004 ,TS16949 Certified |
12 | Leadtime | Depend on structure and customer requirements |
13 | Package | Wooden cases |
14 | Transportation | By sea/By air/By express(TNT.DHL,FEDEX,etc) |
15 | Price Term | FOB Shanghai , EXW , depend on customer requirements |
16 | Payment | T/T,L/C |
Tooling Developing Procedure
1. Quotation: We need your require clearly
2. Negotiation: Material, cavity, price, delivery time, payment term, etc.
3. Order: According your own design or choice our design
4. DFMEA: Deign failure mold & Effect analysis to reduce risk
5. Mold design: 2D/3D drawing
6. Cutting Tooling Notice: After customer approve the mould design will start making mould
7. Weekly Report: We will update the mold schedule every week
8. Sample Confirm: Send you sample for conform it, if not satisfied by customer. We modify mould.
9. Delivery Mold: Delivery mould after customer approve sample and arrange shipment
How to place your order ?
1. Please send us your drawings( 2D&3D) or sample.
2. Our engineering team work on them and submit competitive quotation for you.
3. Confirm sample order and fabricate samples after you approve the quotation and submit them to you for your inspection.
4. Confirm production order after you approve samples.
5. Payment and shipping terms are negotiable.