
Add to Cart
Part name | Precision electronic plastic injection mould |
Mould Base | LKM,HASCO,DME |
Cavity/core material | 2738,2343,S130,2344,718,8407,S136,P20,KD-61,NAK80,H13 ect |
Cavity QTY | Single-cavity/Muti-cavity |
Runner | cold/hot runner |
Gate | Submarie gate,side/edge gate |
Mould lifetime | 100,000 - 1,000,000 shots |
Plastic part material | PC,PA,ABS,PVC,PA66,TPE,SAN,POM.etc |
Lead time | 20-40 days based on different products |
Design sofeware | UG/CAD/PROE |
What we can do!
Advantages | Contents |
1. Customized | Logo, size, color, shape etc. |
2. Design | Our experienced designers can draw your ideas and help you on the designs. |
3. Professional | Skilled plastic product engineers and mold designers give professional suggestions on the plastic part design and mold design. |
4. Quality | 100% passed our internal testing and inspection. |
5. Production | Over 20 years experience in plastic production. |
6. Service | 1. Fast after-sale service.
2. Technical support team will give you some advanced support when using.
3. One - stop service from designs to packing. |
7. Cavity QTY | Single/ Multi-cavity |
Q1 How to have my components quoted?
A1: Please contact us via trade manager or Email and send us your drawings inclusive of 2D and 3D(.STEP or .IGES files) and detail requirements. We are pleased to sign NDA with you if you prefer.
Then our engineering team will work on them and submit a competitive quotation to you.
Q2 What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40-45days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15days normally.
Q3 Can I have prototypes for testing before tooling?
A3: Yes, our factory has a team to support prototypes with machining process to fabricate them for your testing.
Q4 How to ship the samples and production order?
A4: We will normally ship samples via DHL, UPS, or FedEx via our cooperated forwarder of freight collect. For the shipping of production order, it will be by sea or by air.
Q5 How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production other.